Home / Jobs / CONSTRUCTION SCHEDULE ANALYST

CONSTRUCTION SCHEDULE ANALYST

Naval Facilities Engineering Systems Command · Department of the Navy · Andersen Air Base, Guam

💵 $106,437–$138,370 per year⏳ Closes Jan 20, 2027
Federal agencyGS-13
At a glance

A job with Naval Facilities Engineering Systems Command in Andersen Air Base, Guam. It pays $106,437–$138,370 per year at grade GS-13. Applications close on Jan 20, 2027 — 81 days left.

Working pattern
Telework eligible
Who can apply
Open to the public
Clearance
Secret

Main duties

  • You will provide assistance and technical guidance to engineers/ architects exercising management and administrative skills in leading the execution of Capital Improvements construction projects.
  • You will provide support during the design phase of construction projects to ensure an appropriate construction duration is established for all MILCON, O/M Special (or equivalent), and large/complex NWCF projects.
  • You will maintain historical and current CI metrics on schedule growth via use/modification of existing eContracts construction reports.
  • You will provide recurring data analysis (minimally on a semi-annual basis) to CI Construction Product Line Coordinator/Manager along with recommendations to improve overall product line performance improvement You will provide testimony during Armed Services Board of Contract Appeals (ASBCA) or arbitration cases.
The original posting

Full details

About the role

This is a public notice flyer to notify interested applicants of anticipated vacancies. Applications will not be accepted through this flyer. Interested applicants must follow the directions in the "How to Apply" section of this flyer to be considered.

There may or may not be actual vacancies filled from this flyer. Notice of Result letters will not be sent to applicants who respond to this flyer.

What you will do

  • You will provide assistance and technical guidance to engineers/ architects exercising management and administrative skills in leading the execution of Capital Improvements construction projects.
  • You will provide support during the design phase of construction projects to ensure an appropriate construction duration is established for all MILCON, O/M Special (or equivalent), and large/complex NWCF projects.
  • You will maintain historical and current CI metrics on schedule growth via use/modification of existing eContracts construction reports.
  • You will provide recurring data analysis (minimally on a semi-annual basis) to CI Construction Product Line Coordinator/Manager along with recommendations to improve overall product line performance improvement You will provide testimony during Armed Services Board of Contract Appeals (ASBCA) or arbitration cases.
  • You will possess a thorough understanding of scheduling requirements and supporting software to provide training for all CM (and Construction Engineering Technician, as applicable) community.
  • You will participate on Construction Assist Visits to audit current field office operations for conformance to NAVFAC processes and effectiveness of field staff to manage schedule requirements.

How you will be evaluated

In order to qualify for this position, your resume must provide sufficient experience and/or education, knowledge, skills, and abilities to perform the duties of the specific position for which you are being considered. Resumes are restricted to no more than 2 pages. Illegible/unreadable resumes will not be considered.

Your resume is the key means we have for evaluating your skills, knowledge, and abilities as they relate to this position. Therefore, we encourage you to be clear and specific when describing your experience. As vacancies occur, the Human Resources Office will review your resume to ensure you meet the hiring eligibility and qualification requirements listed in this flyer.

You will be rated based on the information provided in your resume, along with your supporting documentation. If selected, you may be required to provide additional supporting documentation. If after reviewing your resume and supporting documentation, a determination is made that you inflated your qualifications and/or experience, you may be found ineligible/not qualified.

Please follow all instructions carefully. Errors or omissions may affect your rating or consideration for employment. All qualification requirements must be met before being considered for any vacancies.

Documents you must provide

  • A complete resume is required.
  • Resumes are restricted to no more than 2 pages.
  • Illegible/unreadable resumes will not be considered.
  • Your resume must show relevant experience, job title, duties and accomplishments.
  • Your resume must show complete information for each job entry to support minimum qualifications.
  • The following information should be provided in your resume: employer's name, starting and end dates (Mo/Yr), hours per week if experience was less than full time (35-40 hours per week), and pay plan, series and grade level (e.g. GS-0201-09) for relevant federal experience.
  • TIP: A good way to ensure you include all essential information is to use the Resume Builder in USAJOBS to create your resume.
  • Are you claiming membership in any professional organizations, or possession of a license, certificate or credentials?
  • Check the Conditions of Employment section above to see if any are required.
  • If you claim membership, license, certification, or credentials, you must submit a copy of said document in your application package.
  • Are you using education as a substitute for some or all of the experience requirement?
  • Is there a basic education requirement for this position?
  • Check the Education section above to see what is allowed and what is required.
  • Any claims you make in your resume or assessment questionnaire regarding education or degrees MUST be supported by submitting with your application official or unofficial transcripts or a list of courses, grades earned, completion dates, and quarter and semester hours earned issued from your school.
  • While unofficial transcripts are acceptable for initial application, an official transcript will ultimately be required if you are selected for the position.
  • You may submit a copy your degree(s) if specific coursework does not have to be verified.
  • Are you a veteran claiming 5-point veterans' preference or claiming sole survivorship preference?
  • You must submit a copy of your latest DD-214 Certificate of Release or Discharge from Active Duty (any copy that shows all dates of service, as well as character of service [Honorable, General, etc.] is acceptable) OR a VA letter that shows dates of service or service connected disability AND character of service.
  • If you have more than one DD-214 for multiple periods of active duty service, submit a copy for each period of service.
  • If you were issued a DD-215 to amend aforementioned information on the DD-214 you must submit that too.
  • If you are not sure of your preference eligibility, visit the Department of Labor's website: Veterans' Preference Advisor Are you a disabled veteran or claiming 10-point veterans' preference?
  • If you are eligible to claim 10 point veterans preference you must submit a DD-214 Certificate of Release or Discharge from Active Duty as described above for 5-point preference.
  • You must also provide the applicable supporting documentation of your disability (e.g. disability letter from the VA) as described on Standard Form-15 (SF-15). ***
  • Are you an active duty service member?
  • Active Duty Service Members are required to submit a statement of service printed on command letterhead and signed by the command.
  • The statement of service must provide the branch of service, rate/rank, all dates of service, the expected date of discharge and anticipated character of service (Honorable, General, etc.).
  • Application documents, including supplemental ones, may be shared outside the Human Resources Office.
  • Supplemental documents may contain your SSN, DOB, or personal information of others (e.g., on military orders, marriage certificates).
  • You may redact this information before submitting; however, if selected, you must provide unredacted originals.

What to expect next

Qualified applicants will be referred to the hiring manager. The selecting official may choose to conduct interviews. Our evaluation will be based on the information you provide.

You should expect that we will verify performance, suitability, and security information and take that information into account in making employment offers.

Additional information

***** Guam is designated as a medically underserved area. Military medical facilities offer space-available primary and limited specialty medical care; however, services are not guaranteed. ***** This position is also subject to a Cost of Living Allowance (COLA) and Non-Foreign Post Differential (NFPD) currently set at 11.88% and 13.12%, respectively.

COLA and NFPD are subject to change without notice. This position is covered by the Department of Defense Priority Placement Program. Several vacancies may be filled.

Relocation expenses (i.e. PCS) or relocation incentives as described in 5 USC 5753 may be authorized in accordance with applicable travel regulations. Certain incentives (such as Recruitment, Relocation or Student Loan Repayment) may be authorized to eligible selectees.

A relocation incentive is generally a single payment intended to offset some of the relocation costs experienced by the selectee. A relocation incentive may be authorized. A tentative offer of employment will be rescinded if the selectee fails to meet the pre-employment requirements, including failure to report to any of the scheduled appointments.

Federal annuitant information: The selection of an annuitant is subject to the Department of Defense and Department of the Navy policy on the employment of annuitants. Policy information may be found at: *** Veteran's preference does not apply when selecting individuals under this specific hiring authority.

However, if you claim veteran's preference, you will be required to submit supporting documentation with your application as described in the Required Documents section below.

How to apply

GovHealthJobs indexes this posting from a public or licensed source and links back to it. Every application is submitted on the official employer or agency website under that organization’s own process and privacy terms. We are an independent information service — not a government body, agency, or hospital system — and we do not collect résumés or forward applications.

Members only · $1.99/month · 5-day trial — join to apply →

Applying is for paid members ($1.99/month, cancel any time). Membership also shows the contact details a posting carries, turns on email alerts and includes our guides to applying and interviews.

Details on this page reflect the source posting as of Nov 1, 2026. Closing dates and salary ranges can change without notice — the official listing is always authoritative. How our coverage works.

Nearby

Similar jobs

Federal agencyGS-12Vets' preference

ARCHITECT

Naval Facilities Engineering Systems Command

You will serve as a Architect in the Planning, Design and Construction (PDC) Branch of NAV FACILITIES ENGINEERING COMMAND SE.

📍 Fort Worth, Texas💵 $97,307–$126,502 per year⏳ Closes Nov 6, 2026 (6d)
Federal agencyGS-13Vets' preference

MECHANICAL ENGINEER

Naval Facilities Engineering Systems Command

You will serve as a MECHANICAL ENGINEER in the Planning, Design and Construction Directorate (PDC) of NAVFAC SOUTHWEST.

📍 San Diego, California💵 $121,585–$158,062 per year⏳ Closes Nov 6, 2026 (6d)
Federal agencyGS-13

PROGRAM CONTROL SPECIALIST

Naval Facilities Engineering Systems Command

This is a public notice flyer to notify interested applicants of anticipated vacancies. Applications will not be accepted through this flyer. Interested applicants must follow the …

📍 Pearl Harbor, Hawaii💵 $111,119–$156,715 per year⏳ Closes Nov 18, 2026
Federal agencyGS-06Vets' preference

TRANSPORTATION ASSISTANT (PASSENGER)

Pacific Air Forces

Click on "Learn more about this agency" button below to view Eligibilities being considered and other IMPORTANT information. The primary purpose of this position is: to provide pas…

📍 Andersen Air Base, Guam💵 $45,409–$59,031 per year⏳ Closes Nov 4, 2026 (4d)
Federal agencyGS-13Vets' preference

MECHANICAL ENGINEER

Naval Facilities Engineering Systems Command

You will serve as a Senior Mechanical Engineer in the Project Management & Engineering Branch, Resident Officer in Charge of Construction (ROICC) New London, of Naval Facilities En…

📍 Groton Submarine Base, Connecticut💵 $120,094–$156,124 per year⏳ Closes Nov 4, 2026 (4d)

Browse every listing